This project originally started as a general remodel/update to a well built home in Glen Ellyn. However, the planning and design process led to a significant reconfiguration to the entire 1st floor and half of the 2nd floor. Some major structural changes were made, rooms were built where there originally were none, the kitchen was fully relocated to the back of the house, and originally vaulted ceiling areas were utilized for an epic primary bathroom/sauna area.